I. Project Background

On January 7, 2025, a severe wildfire broke out in Los Angeles, California, and is still raging. According to official statistics, the wildfire has so far caused at least 24 deaths, destroyed over 12,300 buildings, and left more than 400,000 users without electricity. The economic losses caused by the wildfire are preliminarily estimated to be close to 50 billion US dollars. The severity of this wildfire has been described by President Biden as the "worst" in California's history.

II. Project Objectives

This project aims to restore the infrastructure, housing, and social services in the affected areas through an efficient and sustainable reconstruction plan, while enhancing the disaster resilience and long-term self-reliance of the communities. The project will adhere to the principles of environmental protection and sustainable development, aiming to create a more resilient "Los Angeles 2.0."

III. Affected Areas and Needs Assessment

(i) Affected Area Size

The wildfire has had a wide impact, mainly concentrated in Los Angeles County and its surrounding areas. It is estimated that the affected area covers hundreds of square kilometers, with multiple communities completely destroyed. For example, parts of Los Angeles County and Ventura County are still under extreme wildfire danger.

(ii) Resource Needs Analysis

1. Building Materials

  • Quantity: To rebuild over 12,300 buildings, a large amount of building materials, including steel, wood, cement, and glass, will be required. The demand for building materials alone is expected to have a significant impact on the supply chain across the United States.
  • Environmental Requirements: Priority will be given to sustainable materials, such as reclaimed wood and eco-friendly bricks, to reduce environmental impact.

2. Eco-Friendly Housing

  • Quantity: Providing safe and eco-friendly housing for disaster-affected residents is a top priority of the reconstruction effort. It is estimated that thousands of eco-friendly houses need to be built and repaired.
  • Construction Standards: The housing design must meet environmental and disaster-resistant standards, incorporating energy-saving technologies and renewable energy systems, such as solar panels and rainwater collection systems.

3. Engineering Construction

  • Infrastructure: Rebuilding roads, bridges, water supply systems, power facilities, and communication networks is key to restoring community functions. It is estimated that the cost of infrastructure repair and reconstruction alone could reach tens of billions of US dollars.
  • Social Service Facilities: These include schools, hospitals, community centers, etc. The reconstruction of these facilities needs to be combined with local needs and sustainable development requirements.

(iii) Human and Material Resources Needs

  • Labor Force: The reconstruction work requires a large number of professional construction workers, engineers, technical personnel, and managers. It is estimated that labor shortages will be one of the major challenges in the reconstruction work.
  • Equipment and Machinery: There is a high demand for heavy equipment such as bulldozers, cranes, and transportation vehicles, and early planning for equipment allocation is needed.
  • Funding: The reconstruction work is estimated to cost tens of billions of US dollars. The sources of funding include federal government assistance, state government grants, private investment, and international donations.

IV. Project Implementation Plan

(i) Short-Term Goals (1 - 2 years)

  • Debris Clearance: Organize professional teams to clear debris in the affected areas to ensure safety.
  • Temporary Housing: Provide temporary housing for homeless residents, including mobile homes and container houses.
  • Infrastructure Repair: Prioritize the repair of key infrastructure such as water supply, power supply, and communication.
  • Community Participation: Conduct community consultations to collect residents' opinions and develop reconstruction plans.

(ii) Medium-Term Goals (3 - 5 years)

  • Eco-Friendly Housing Construction: Large-scale construction of eco-friendly housing to meet the long-term housing needs of disaster-affected residents.
  • Infrastructure Upgrading: Rebuild roads, bridges, and other infrastructure to enhance their disaster resilience.
  • Reconstruction of Social Service Facilities: Restore social service facilities such as schools and hospitals to improve community functions.
  • Economic Development Support: Provide entrepreneurial support and job training to promote local economic recovery.

(iii) Long-Term Goals (over 5 years)

  • Community Resilience Enhancement: Enhance the disaster resilience and self-reliance of communities through sustainable development measures.
  • Environmental Restoration: Carry out ecological restoration projects to restore the natural environment of the affected areas.
  • Continuous Monitoring and Improvement: Establish a long-term monitoring mechanism to ensure the sustainability and effectiveness of the reconstruction projects.

V. Collaboration Opportunities

We have obtained approval from the California government for some post-disaster reconstruction projects and are now sincerely inviting various partners, including building material suppliers, construction companies, eco-friendly technology enterprises, financial institutions, etc. Those who are interested in cooperation are welcome to contact us to jointly promote the post-disaster reconstruction work in California.

We look forward to working with all sectors to create a more sustainable and resilient California.